A typical deck's ground screws go in in a morning, and the builder can start framing straight after. They come supply-only for builders and confident DIYers, or installed by us.
Why screw piles
- No holes to dig and no concrete bags to mix.
- Framing starts straight after, with no wait for concrete to set.
- Adjustable saddles make it easy to get the bearers dead level.
- Supply only for builders and confident DIYers, or installed by us.
Good to know
Many low decks don't need a building consent, but higher decks may, so check with your council or designer. Ground screws suit most decks, and raised decks usually take the bigger G89.
How it works
From enquiry to building on it.
-
1
Tell us about it
Call, email or send your estimate. Plans help, but a sketch with dimensions is fine to start.
-
2
Site check
We look at access, ground and underground services, and confirm the right pile for the job.
-
3
Engineering
For consented work, the engineer designs the layout and target torque and issues a PS1.
-
4
Install day
Set-out, then each pile screwed to target torque and cut to level, with depth and torque logged.
-
5
Handover
The torque record and PS3 go to you and the engineer, and your builder starts straight away.
Other applications
Got a site? Let's get it piled.
Tell us what you're building and where. We'll come back with a quote, usually within a working day.