Heavier piles with cap plates for steel portal frames, canopies and light commercial buildings, including Kiwi Steel Frames builds. Every one is a specific design, with load testing available.
Why screw piles
- Heavy H140 piles with cap plates bolt straight to steel portal bases.
- No waiting for footings to cure, so the frame goes up sooner.
- Every pile's torque is logged, and load testing is available.
- We share a yard with Kiwi Steel Frames, so piles and frame are planned together.
Good to know
Commercial work is always a specific design by a chartered engineer, who sets the pile size, depth and target torque for the site and its loads. We provide the PS3 and torque record at the end.
How it works
From enquiry to building on it.
-
1
Tell us about it
Call, email or send your estimate. Plans help, but a sketch with dimensions is fine to start.
-
2
Site check
We look at access, ground and underground services, and confirm the right pile for the job.
-
3
Engineering
For consented work, the engineer designs the layout and target torque and issues a PS1.
-
4
Install day
Set-out, then each pile screwed to target torque and cut to level, with depth and torque logged.
-
5
Handover
The torque record and PS3 go to you and the engineer, and your builder starts straight away.
Other applications
Got a site? Let's get it piled.
Tell us what you're building and where. We'll come back with a quote, usually within a working day.