It depends on the pile and, above all, on the ground. How the capacity is worked out, and checked at every pile.

The ground decides

A pile is only as strong as the soil it bears on. The same pile can carry far more in stiff clay than in soft silt, so there's no single number for "a screw pile".

What matters is the pile's size, how many helix plates it has, how deep they go, and what the ground is like at that depth.

Three directions of load

A foundation has to resist more than weight:

  • Compression: the weight of the building, its contents and any snow, pushing down.
  • Tension (uplift): wind or an earthquake trying to lift the structure. Helix plates are good at this, which is why screw piles suit decks, carports, signs and solar arrays.
  • Lateral: sideways forces, resisted by the stiffness of the shaft and the soil near the surface.
Three directions of load on a pile: compression pushing down, tension lifting up, and lateral forces from the side Compression Weight pushing down Tension (uplift) Wind or quakes lifting up Lateral Forces from the side
A foundation is pushed down, lifted up and pushed sideways. Helix plates resist all three, and uplift especially.

Torque as a check

As a pile is screwed in, the torque needed to turn it rises with the strength of the soil around the helix. Engineers estimate capacity by multiplying the final installation torque by a factor that depends mainly on the shaft size.

For consented work, the engineer sets a target torque for each pile. The installation record then shows that every pile reached it, at the depth it was installed to.

How we install screw piles

Chart of installation torque against depth: the torque stays low through the soft layer, rises steeply in the firm layer, and the pile stops once it reaches the target torque set by the engineer Soft layer Firm layer Installation torque Depth 0 m Target torque set by the engineer Target reached: the pile stops here and its depth and torque go on the record
What an installation record shows: the torque stays low through soft ground, climbs in firm ground, and the pile stops once it reaches the engineer's target.

Load testing

On larger or unusual jobs, a pile can be load tested on site. It's pushed or pulled with a jack beyond its design load while its movement is measured, which confirms the design for that ground. We can arrange load testing wherever the engineer wants it.

Who sizes the piles

For consented work, a chartered engineer designs the pile size, layout, depth and target torque for your building and site, and issues a PS1. For smaller jobs that don't need consent, like many decks and sheds, we size the piles to suit the structure and the ground, and tell you if we think it needs an engineer.